LK
Hi,
I'm using EPC with columns to draw some process.
My process has activities within a system, and some events of this activities have integration with other system, as attached.
Anyone can help me? in short, i have to show integration of systems in a business process. for example:
1) activity: write a report - this activity is connected to the system a
2) event: report is created
3) connected to the event i have a integration to the system b, where this system receive this report and stop the payment.
how can i do this?