I'm happy to announce that ARIS Cloud 10 Service Release (SR) 4 is now available in the public cloud. You can use the new features of ARIS Cloud Advanced immediately after your next log in.
ARIS Cloud 10 SR 4 provides the following new features:
- The steps view now allows navigating via process interfaces between different processes (Event-driven Process Chain (EPC) model types)
- The overview, table and RACI tabs support a freezing of the first row for easy scrolling
- Optimized view generation for drawn connections in swimlane and column-based models
- Layout enhancements and further general enhancements in view generation
- New print scale preview
- New interactive semantic checks in ARIS Connect Designer
- Matrix models for maintenance of arbitrary connections between arbitrary objects with just one click
You find more information about the new features in the ARIS 10 SR4 features overview.
If you are new to the cloud, go to ariscloud.com and start with your free trial version of ARIS Cloud immediately.
Hi,
just loaded up the latest service release 4. Having a problem when navigating in the steps view using the new process interface capability.
When I select the next process I get an assignment warning that is it unable to open the assigned diagram
It is possible to open the assignment from the diagram view.
Is there something that I'm required to 'turn on' to get the assignment links in the steps view to work?
Cheers,
Dave
Dear David,
the image you inserted is not shown.
I'd like to recommend that you verify whether that warning message also pops up for the models in the UMG database.
To do so, open the steps view of Quotation processing (see below), click on the process interface Customer qualification to open the previous process Customer qualification (see 2nd image):
Cheers
Rune